Venmar THH 1.0 User Manual Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
Attach this duct to the
FRESH AIR TO BUILDING
port (see icon
on the top of the unit), using tie wrap and duct tape. Use
the provided blue sticker dots to identify the duct.
Locate the opening for the filtered air ductwork (HEPA 3.2
unit) or fresh/filtered air ductwork (THH 1.0 unit) on the
furnace/air handler return duct at a minimum linear
distance of 2’ (0.61 m) upstream (return side : A+B+C).
4.10 INSTALLING DUCTWORK AND REGISTERS (CONTD)
4.10.2 C
ENTRAL DRAW POINT
NOTE FOR THH 1.0 UNIT ONLY : For this type of installation, it is not essential that the furnace blower runs when the unit is in
operation, but we recommend it.
Filtered air (HEPA 3.2 unit) distribution ductwork (Return side connection)
4. UNIT INSTALLATION (CONT’D)
- 14 -
WARNING
When performing duct connections, always use approved tools and materials. Respect all corresponding laws
and/or safety regulations. Please refer to your local building code.
!
VD0114
A
B
C
VD0153
A
B
C
VO0047
VO0061
Stale air exhaust ductwork
Same as for Stand Alone System, described in point 4.10.1.
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 31 32

Comments to this Manuals

No comments