Venmar HEPA 4000 Specifications Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 61
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
Unit Inspection on Arrival
Inspect the equipment exterior and interior for any dam-
age on arrival that may have occurred during unit ship-
ment and for shipped loose parts. Ensure that there is
no damage to any protruding exterior components such
as door handles, disconnect switch handle, etc. or to
internal components such as fans, motors, dampers, en-
thalpy wheel and structures. File a claim with the shipping
company if the unit is damaged. Check the packing slip
against all items received. If any items are missing, sign
the carrier’s bill of lading with the notation “Shipment
Received Less Item #___.” Contact the factory immediately
if damage is found. No return shipment will be accepted
without authorization.
Unit Application Limitations
Using Venmar CES units for temporary ventilation dur-
ing construction is subject to the unit warranty terms and
should be reviewed carefully before proceeding, as this
may void the standard warranty conditions.
Fine dust, larger particulate matter, solvents, varnishes and
other chemicals may cause filter clogging and elevated
cabinet pressures, higher power consumption and pos-
sible irreparable damage to the desiccant material of the
enthalpy wheel, which could reduce energy recovery per-
formance of the wheel and also reduce the heat transfer
effectiveness of other components. Potential damages
include, but are not limited to, these examples.
IMPORTANT
The hoods for these units are not installed from the fac-
tory for shipping purposes and must be installed on site.
They can be installed before or after the unit is installed
providing the hoods are secured and are not damaged
by the spreader bars or cables. Foam gasket is factory
attached to the hood flanges for sealing to the unit and
self drilling screws supplied for fastening to the unit. See
Appendix A for hood installation.
CAUTION
Venmar CES equipment is not designed to be used for
temporary heating, cooling and/or ventilation during
construction.
VCES-VHC72-IOM-1H
5
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 60 61

Comments to this Manuals

No comments